Projects in operation

 

Pourvoirie JB Scott (Canada)

Capacity installed: 50 kW- non-grid

Net Head: 3,7 meters

Optimal flow: 1,8m3/sec

 

Pourvoirie des Cents Lacs (Canada)

Capacity installed: 50 kW- non-grid

Net Head: 58 meters

Optimal flow: 0,113m3/sec

 

Kingsey Falls (Canada)

Capacity installed: 60 kW- on grid

Net Head: 4,4 meters

Optimal flow: 1,75m3/sec

 

Pourvoirie Wilderness (Canada)

Capacity installed: 25 kW- non-grid

Net Head: 2,5 meters

Optimal flow: 1,4m3/sec

 

 

Guinemayo (Pérou)

Capacity installed: 450 kW- non-grid

Net Head: 142 meters

Optimal flow: 1,240m3/sec

 

  Pourvoirie Notawissi (Canada)

Capacity installed : 50 kW- non-grid

Net Head : 80 meters

Optimal flow: 0.091m3/sec