LTCC offers a turnkey solution with a competitive price. That solution begins with a preliminary study and continues through the civil engineering work and the building, the installation and the maintenance of the equipment as well as the financing.of the project.
All of the activities is done by subcontracting to minimize the business costs of operation but a control is exerted by LTCC in order to assure the quality of the services offered by each subcontractor engaged with an aim of giving a final project with the measurement of waitings of the customer


The unique concept of LTCC offers an economical alternative for the renovation of existing plants and an ecological aspect in rural areas difficult of access.

An investment in an hydroelectric project requires a short period of amortization and provide savings that translate into profits, often in the very first year of operation.

An hydro-electric plan provides reliable electricity without the inconvenience of the diesel generator noise, smell and pollution. The equipments may be installed in derivation of the rivers, wich means that we do not require resevoir and does not flood banks. They constitute cleaner superior environmental alternative compare to diesel generators.


Renovation of existing plant

We recommend the projects which have a potential of realization based over a short period, which avoids us significant investments on the commercial development of the projects. The privatized electric companies are a very significant market. We offer them to renovate their parks of small power stations to maximize their full potential . Often forsaken with the profit of the large power stations, the small hydroelectric power stations are today a very large potential of incomes. With the existing civil installations, we have examples where we multiplied by three the output. The projects studied to date often have a return on investment in period lower than two years. Moreover, these projects are not fixed at the requests of licence which the new projects require, which accelerates the process of realization


The diesel replacement of power stations by the electricity production with hydroelectric power stations:

A small hydroelectric installation of a power of 5MW or less is defined as a mini power station. It can be install in small falls. It can be used in independent network to provide the electricity necessary in isolated regions which are not linked to the general network. The installation of a mini power station depends on the hydrological resources and the drop height, of the characteristics of the ground, the constraints related to the environnment and of course the financial aspect of all the operation. The only known disadvantage is the investment of a significant sum from the beginning. However one of the great advantages is its durability. The service life of such equipment is almost unlimited (40 years).


Components of a micro power generating plant :

-Water intake
-Penstocks
-Turbine
-Canal of evacuation
-Generator
-Frame Box
-Connecting power line


Micro Power Generating Plant ;

 

Common residential or commercial appliances energy requirements:

Appliances

Consumption

10 lights bulbs 1 000 watts
20 light bulbs 1 200 watts
1 refrigerator . 500 watts
1 kitchen range 1 500 watts
.10 heaters 7 500 watts
1 compressor 500 watts
1 machine tool 1 000 watts
1 TV set 200 watts
1 computer 300 watts
1 washer 500 watts
1 dryer 1 500 watts
1 water heater 2 000 watts